What is in the field?
Meter types, locations, communication options and the existing infrastructure are surveyed on site.

EXISTING METER INFRASTRUCTURE
Vicitech does not manufacture gas meters. It surveys your existing meter and field system and, by defining the right converter, communication and platform configuration, enables remote reading, automatic billing and process tracking. The scope is designed around the meter and infrastructure characteristics in the field.
APPROACH
The aim is to adapt the existing infrastructure to remote reading without replacing the meters in the field. A survey and compatibility assessment determines which meters can be read with which converter and communication configuration.
Compatibility of existing equipment is confirmed by a site survey; we do not claim that every system is unconditionally compatible.

SURVEY AND ASSESSMENT
Meter types, locations, communication options and the existing infrastructure are surveyed on site.
The right converter and data acquisition method are defined by the meter interface; compatibility is confirmed.
Converter configuration, data transfer and the stages of moving to the Vicitech platform are planned.
TRANSITION STAGES
Existing meter and infrastructure characteristics are surveyed; a compatibility assessment is made.
The right converter, communication and platform configuration is defined for the project.
The converter is installed; meter data is transferred remotely to the Vicitech cloud platform.
Automatic billing and process tracking go live on the platform.
Existing meters stay in place; remote reading is enabled by converter and platform configuration.
The scope is designed around the meter and infrastructure characteristics in the field; no standard single package is imposed.
Survey, configuration, installation and platform transition are carried out by Vicitech from a single source.
No. Vicitech does not manufacture or sell gas meters; it prepares existing meter and energy infrastructure for remote reading.
Compatibility is confirmed by a site survey. The right converter and method are defined by the meter interface and infrastructure; unconditional compatibility is not claimed.
The duration depends on the number of meters in the field, the infrastructure and the configuration need; it is shared with the project plan after the survey.